Asbestos Abatement
Asbestos

Schedule Your Free Consultation Now

Take a moment to complete and submit this form, and a dedicated COIT Account Manager will be in touch soon.

Address

*Required

Type of Service

ASBESTOS IN YOUR HOME/BUSINESS CAN BE A SCARY SITUATION! 

Asbestos is a wonder fiber. It is a strong and flexible fiber. Asbestos is resistant to chemicals, heat, water and electricity made it an excellent insulator for the steam engines, turbines, boilers, ovens and electrical generators that powered the Industrial Revolution.

 Asbestos removal projects require certified supervisors and workers to perform the abatement.  State regulations require permits and notifications to multiple agencies before starting any project.  Superior Cleaning & Restoration strictly adheres to all state and federal regulations, our clients’ health and the health of our employees depend on it.

Asbestos Removal Projects

Popcorn Removal

Air sampling is done pre, during and post remediation. Containment is set up in a three stage decontamination unit (with shower). Negative Pressure Air Machine (filter all air inside containment 4 times an hour), compressor for supplied air to workers for breathing. Once it’s all set up, we wet the ceiling, and scrape it off, then detail clean with scrubby and wire tooth brushes. Double bag and label all debris. Then encapsulate, before running our post clearance (which needs to be read at a Lab with a microscope) before tearing down containment.

Textured Drywall

Textured Drywall has the same as process as popcorn removal, except it cannot be scraped off. A certified technician must remove the drywall.

Sheet Vinyl, Vinyl Asbestos Tile (VAT) and Mastics

Air sampling is done pre, during and post remediation. Containment is set up (basically a big plastic bag for removal), Load out, Negative Pressure Air Machine (filter all air inside containment 4 times an hour). Once it’s all set up, we wet the flooring, then scrape it off with spud bars and razor scrapers. Sometimes this requires us to use chemicals (solvents to dissolve the mastics)

Pipe Wrap

Air sampling is done pre, during and post remediation. Containment is set up (basically a big plastic bag for removal), 3 stage decontamination unit (with shower), Negative Pressure Air Machine (filter all air inside containment 4 times an hour), or if small amounts are being removed glove bags can be utilized instead of full containments. Debris is double bagged and labeled.

Cement Asbestos Board (CAB) Siding and Roofing

This work is typically completed outside. Our certified technicians complete air sampling i during the removal process. A regulated area is set up. Plastic drops and fall protection are utilized as needed. Proper wetting is also used. Debris is double bagged and labeled.

Schedule your free consultation today